Add measured extras after the base quote is issued — extra walls, bulkheads, ceiling patches or scope changes with a clear running total.
Variations & extras · Quofix
Add measured extras after the base quote is issued — extra walls, bulkheads, ceiling patches or scope changes with a clear running total.
Variations stay on the same job package as the original takeoff and quotation, so you are not starting a new spreadsheet every time the architect issues a SI.
Site sizes → quantities → ex-VAT quotations.
Free takeoff · sign in to issue · £3.99 per package or monthly
It keeps context — base quote, extras and revised total on one package — rather than isolated arithmetic with no job history.